72-hour power supply assurance with no momentary interruption, generator + UPS.
Supply electricity necessary for disaster recovery.
■Without a generator, business operations stop due to power outages. ■Without a long-term power supply, fuel becomes unavailable, affecting recovery. ■Without a UPS, communication equipment may fail due to brief power outages. <Small emergency generator manufactured by Sanyu Industry> ・SEGS160 ・SEGS1100 ・SEGS1125 ・SEGS3150 Over 40 years of experience, compact design Passed seismic testing (equivalent to seismic intensity 7) 72 hours of continuous operation, verified with actual equipment <UPS manufactured by GS Yuasa, tested for compatibility with power generation equipment> ・THA3000-10 ・THA5000-10 THB10K-10-200S/W-M8 Tōei Dengei Co., Ltd. GS Yuasa dealer Experience selling over 2,500 units annually Installation and maintenance battery replacement services available Shutdown construction possible ■Configuration diagram of generator + UPS For more details, please refer to the catalog or contact us.
- Company:東栄電業株式会社 【GSユアサ代理店】 【京セラソーラー認定技術代理店】
- Price:Other